24-7 Diamond Drilling & Sawing Services Limited were contacted by the Kier Group to carry out loads of tasks on the A30 bypass project, ranging from diamond road sawing, diamond drilling and diamond wire sawing.
Under a tight project time deadline, we have had to attend site at all hours of the day to meet the required deadlines of the project, at this time we have undertaken over 5.5 kilometres of road sawing up to a depth of 500mm deep in Ashfelt road surface, also diamond drilling works to manholes for waste water drainage and track sawing of bridge structures etc., at present we have met all the deadlines and standards required on this testing project.